Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | XGMA |
Model Number : | Double Shield TBM |
Certification : | ISO 9001:2008 |
Price : | Negotiable |
Delivery Time : | 18 months after receiving advanced payment |
Description:
Double Shield TBM
Mainly used in hard and soft rock strata with two operating modes, i.e., double shieldboring mode and single boring mode.
Application:
Guadarrama Project in Spain
Lying 50 kilometers to Madrid Spain and crossing Guadarrama Mountains, the Guadarrama Tunnel is part of one high-speed rail line on Spanish new high-speed rail network scheme. This tunnel is 28.38km long and designed as two parallel lines, with I.D. of 8.5m and center-to-center distance 30m. A telescopic hard rock TMB with 9.46 diameter is employed in this project. The maximum overburden thereofis 1000m, main formation lithology is featured by granites and compressive strength is 250Mpa.
![]() |